One of the areas of biggest changes at the museum will be our brand new entrance. Visitors will come through glass doors off Bridewell Alley, and into a bigger brighter reception area. This open space will have our reception desk, shop area, and the iconic Carrow Works fire engine. At the moment the builders are busy laying a new concrete floor, which will be polished. The mix of cement and aggrgate has been fine tuned, and with such a huge space to cover, the builders have been dealing with literally tons of material. In other buildings, this would be pumped in, off a lorry, but because of the location of the museum – this hasnt been possible – it’s all going in by hand! We look forward to seeing the end results.
Posted by: jennynmas | October 13, 2010
The new floor takes shape!
Advertisement
Posted in Uncategorized
